Real-time scheduling for industrial load management

Marco Luigi Della Vedova, Tullio Facchinetti

Risultato della ricerca: Contributo in libroContributo a convegno

16 Citazioni (Scopus)

Abstract

A new approach based on real-time scheduling has been recently proposed for the management of electric loads composing a power system with the goal to reduce the peak load of power consumption. The novel idea is to model the power system in terms of timing parameters traditionally adopted in the field of real-time computing systems. In this way, the activation/deactivation of devices can be managed using classical scheduling algorithms developed for executing processing tasks in real-time systems. To prove the effectiveness of the proposed methodology, this paper shows its application to an industrial plant. Electric loads are modeled using timing parameters and a real-time scheduler is used to coordinate their activation. The coordinated management achieves the peak load reduction while meeting given constraints on the industrial process under control. The paper presents the modeling approach of the industrial process. The behavior of the control method is assessed by a simulated example.
Lingua originaleEnglish
Titolo della pubblicazione ospite2012 IEEE International Energy Conference and Exhibition, ENERGYCON 2012
Pagine707-713
Numero di pagine7
DOI
Stato di pubblicazionePubblicato - 2012
Evento2012 IEEE International Energy Conference and Exhibition, ENERGYCON 201 - Firenze
Durata: 9 set 201212 set 2012

Convegno

Convegno2012 IEEE International Energy Conference and Exhibition, ENERGYCON 201
CittàFirenze
Periodo9/9/1212/9/12

Keywords

  • Load Shedding
  • Modeling
  • Power system control
  • Real time systems
  • Scheduling
  • Smart Grid

Fingerprint

Entra nei temi di ricerca di 'Real-time scheduling for industrial load management'. Insieme formano una fingerprint unica.

Cita questo